SEE RESULTS WITH OUR SERVICES
Check out some recent projects completed by the professionals at Golf Construction. We are a customer-centric organization, and believe in continuity and the strong relationships that we have formed. Our culture and principles drive us.

HYATT REGENCY CHICAGO, IL
Project Description:
- Interior Concrete Restoration
- Traffic Bearing membrane and Waterproofing membrane Installation
- New Bollard System
- Tuckpointing
- Repair & Replacement of Plumbing
- Painting of Interior Spaces
- Aggressive Schedule With Strict Noise Restriction Windows
- Over $4 Million of Work Completed

NEWBERRY PLAZA 1030 NORTH STATE ST.
Project Description:
- Masonry Restoration
- Removed & Replace Masonry Wall
- Concrete Repairs
- Waterproofing membrane Installation
- Install on New Pool Deck Pavers & Pedestal System
- Over $8 Million of Work Completed

MALIBU EAST 6033 NORTH SHERIDAN RD.
Project Description:
- Complete Parking Garage Rehabilitation
- Full Façade Repair
- Contracted to Provide a Ongoing Façade Maintenance Program.
- Over $7 Million of Work Completed

SWEDISH COVENANT HOSPITAL CHICAGO, IL
Project Description:
- Façade Repairs
- Concrete Repairs
- Rebuilding of Existing Balconies
- Replace Shelf Angels, Lintels and Install Window Sealant
- Over $2 Million of Work Completed

OAKBROOK CENTER OAKBROOK, IL
Project Description:
- Performed multiple Projects
- Complete Parking Garage Rehabilitation
- Performed Interior Tenant Build-outs
- Performed Façade Repair and Preventative Maintenance
- Removed Existing & installed New Exposed Aggregate Sidewalks
- Performed Post Tension Concrete Repair & Replacement
- Over $5 Million of Work Completed

HABERDASHER 728 WEST JACKSON BLVD.
Project Description:
- Façade Repairs
- Tuckpointing
- Repair & Replace Shelf Angels & Lintels
- Install Windows Sealant on 100% of Building
- Painting of All Exposed Building Concrete
- Over $2 Million of Work Completed

201 W MADISON CHICAGO, IL
Project Description:
- Performed Selective Façade & Interior Concrete Restorations
- Install of Traffic Bearing Membrane & Waterproofing Membrane
- Install of a New Roofing System
- Installed Joint Sealants for 100% of the Parking Structure
- Painted Entire Exterior of Parking Structure
- All Work Completed Within an Aggressive 4 Month Schedule
- Over $1 Million of Work Completed
HABOR HOUSE PLAZA RENOVATION
Project Description:
- All existing pavement, planters, planting beds, fences, fill and landscaping were removed and replaced.
- Replacement of all city sidewalks required to access the outside foundation wall to achieve a proper termination for the waterproofing membrane.
- With the plaza, parking lot, circle drive, and loading dock all above occupied space in the building, the entire area received a hot applied membrane waterproofing system with drainage mat.
- Mew planting areas were created within the plaza area including an automated sprinkler system which encompasses the parkways.
- Over $5 Million of work completed.